How this roof came together.
The challenge
The existing built-up roof held water after every storm and the owner was moving pallets around buckets. They needed a fix that would not shut the building down.
What we found
Core samples showed wet insulation in three zones and several drains sitting higher than the surrounding roof.
What we did
Removed wet insulation, installed tapered ISO to move water to the drains, new drain assemblies, and a 60-mil white TPO membrane, working in sections so the warehouse stayed open.
The result
Water now drains off the roof within hours of a storm, the white membrane keeps the building cooler, and the stock area is dry.